Route builder
Tomorrow's plan. Utilisation above 95% leaves no room to absorb a failed stop, so the band is 75 to 92%.
- Routes planned
- 6
- Mean utilisation
- 78%
- Above the band
- 1
- Unassigned
- 1
264 stops in total
Target band 75 to 92%
Old town at 96%
Evening top-up needs a driver
Planned routes
Tomorrow, Kilnbrook depot
- V-14
North loop
52 stops, 84 km, 7h52m, 06:00 to 14:00
91% - V-08
Riverside
49 stops, 71 km, 6h26m, 07:00 to 15:00
88% - V-31
Old town
55 stops, 42 km, 7h41m, 06:30 to 14:30
96% - V-22
South bank
46 stops, 96 km, 7h8m, 08:00 to 16:00
79% - V-05
Airport corridor
44 stops, 118 km, 7h25m, 14:00 to 22:00
72% - Unassigned
Evening top-up
18 stops, 39 km, 3h44m, 18:00 to 21:00
41%
Coverage
Planned paths across the service area